As progress continues on the Mission Boulevard Bridge, take a look at a few of the improvements coming to this important connection between Jurupa Valley and Riverside. 

🔹 State-of-the-art bridge meeting current seismic and safety standards 

🔹 1,100-foot-long bridge with two traffic lanes in each direction 

🔹 Added shoulders and a raised center median to improve safety 

🔹 Separated multipurpose trail for pedestrians, equestrians and cyclists 

🔹 Connection to the Santa Ana River Trail 

The renderings offer a glimpse of what the completed Mission Boulevard Bridge will look like from the roadway and Santa Ana River Trail. 

🚧 Follow the project’s progress and sign up for email or text updates at MissionBlvdBridge.com //